Short day. Removed the cowling and sanded a 1/2" landing on the lower cowling inlet lip where the transition rubber seal will be installed. The cowling was reinstalled and the right air inlet conical side piece (0.032 2024-T3 aluminum) was cut, bent, fit, drilled and clecoed in place. Fit great. Start left side Monday.