KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  8-21-2014
Number of Hours:  6.00
Manual Reference:  47.8
Brief Description:  Cowling pin / Fuel pump heat shield

Cut apart the epoxy I laid yesterday to support the horizontal cowling hinge keeper. Once apart, I removed the clean peel and added a little more cabosil in the areas to even it out. Tomorrow I will sand these areas and tape and spread mold release in preparation for the front lip. I also cut the hinge pins to length and rolled the ends for easier installation. While the epoxy was curing, I had time to install the Lycoming fuel pump heat shield. Once installed, I torqued and safety wired the fuel pump fasteners. When I do the baffling, I will run a blast tube to its location.
' style=

Cowl pin fiberglass

Cowl pin fiberglass

' style=

Fuel pump heat shield

Fuel pump heat shield

' style=

Cowl pin fiberglass

Cowl pin fiberglass

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.