KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  8-19-2014
Number of Hours:  8.00
Manual Reference:  47.8
Brief Description:  Cowling

I received the hinge pin covers and cover blanks from Geoff and allowing me to start on the side hinges. After measuring and cutting a starter hole, I located the center of the ipper cowling hinge and driller/clecoed the left and right horizontal cowling attach hinges. The hinges were then removed and the holes were set for a AN426-3 rivet. When done, I reassembled the unit and made the final fit of the hinge pin keepers. All was dismantled and the hinges were cleaned in alumiprep and soaked in alodine.
' style=

Drilling cowling hinge

Drilling cowling hinge

' style=

Cowling hinge clecoed

Cowling hinge clecoed

' style=

Cowling hinge pin cover

Cowling hinge pin cover

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.