KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  8-11-2014
Number of Hours:  8.00
Manual Reference:  47.6
Brief Description:  Lower cowling work

I finished the air inlet ramp construction today and test fit them on the engine. After I get the rest of the cowling fit and hinges installed, I will glass them into their final position. Quite a few builders have had the lower hinges on the cowl fail at the eyelets in a couple hundred hours. The consensus is to remove the two lower hinges and install a solid .063 aluminum plate and use screws with nut plates. It will take a little longer to remove the bottom cowling, but fixing it now is lots better then fixing it later. I did get the cowling aft hinges drilled and clecoed. I still need to drill the four screws at the air inlet as well as set the side hinges.
' style=

Air inlet ramps ready to install

Air inlet ramps ready to install

' style=

Lower hinge removed and solid plate installed

Lower hinge removed and solid plate installed

' style=

Initial fit upper and lower cowl

Initial fit upper and lower cowl

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.