KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  7-24-2014
Number of Hours:  2.00
Manual Reference:  FF1-4
Brief Description:  Prop governor installed

Installed the propeller MT governor (P-360-3) and the fastening nuts were torqued to 120 in.lbs. i know the control arm will have to be clocked (turned) to better fit the control cable, but I will wait till I install the cable so I get the best fit.
' style=

Prop Governor

Prop Governor

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.