Brief Description: Heat duct controls and misc installed
Spent the day completing little things left from previous assignments. Now that the lower gear has been installed, I could install the middle seat supports which mount on the lower gear structure. Also, with the doors completed, I installed 18 rivets left open around each door opening to aid during the door manufacture process. The Andair fuel valve was reinstalled. I also installed the two pull/push cables that control the heat ducts. I completely installed the cables, safety wired and fire sealed the firewall. When the panel is installed, I will remove the inside cable portion, and make any adjustments. The shield will remain in place. I am still short the hardware to mount the engine. Rats.