KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  4-16-2014
Number of Hours:  6.00
Manual Reference:  45.15
Brief Description:  Door panel start lay up

Today I removed the right door and installed the hinge cover plates I made. Then I removed all the door hardware and covered the voids with tape and filled them with modeling clay. I then covered the entire interior of the door with blue plastic shipping tape. Once it was all covered, I covered the tape with two layers of BID fiberglass. Once cured, I will trim this panel to fit right up to the Master Carr door seal. Later, this interior panel will be covered with material and attached to the door.
' style=

Door ready for tape

Door ready for tape

' style=

Taping door

Taping door

' style=

Two layers of BID and epoxy

Two layers of BID and epoxy

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.