KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  10-2-2013
Number of Hours:  6.00
Manual Reference:  Section 34-6
Brief Description:  Floor panels and insulation

Worked on the cargo bay door jam getting the door set and the hinge drilled. After that, I fit the "A" shaped wall close out and drilled it. The next task was to debur, alumiprep and alodine. I sure do like turning aluminum into gold. I finished the day vacuuming out the passenger floor and set in the SoundEX insulation. Tomorrow, I plan to paint and install.
' style=

Installing door jam

Installing door jam

' style=

Floor panels ready to paint

Floor panels ready to paint

' style=

SoundEX installed

SoundEX installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.