Brief Description: Floor insulate and conduit runs
I primed, assembled and installed (test fit) the forward section wire cover brackets and panels. They will be removed before I finish paint the interior. After that, I finished my conduit runs under the cargo bay floor and rear passenger seats. They are nice and secure with cushion clamps at every spar and caterpillar edging on any rib pass through. Before I put the cargo bay floor down I wanted to install nut-plates in each of the four cargo bay corners so that I can add tie downs later if desired. To do that, I made doublers for each corner and riveted them on the underside of the cargo bay floor. I used k1000-03 (10-32) nut-plates.