KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  8-28-2013
Number of Hours:  2.00
Manual Reference:  Section 29
Brief Description:  EAA Technical Advisor Review

I am getting ready to insulate the sub floor and install my final floor forward as well as install my lower gear so I though it would be a good idea to have the EAA Tech inspector give it a look see. Sam asked several questions related to the red sealant I used on the firewall (he was happy to see that is was firewall rated). He spent about an hour or so giving it a good look. Made my day. Had a good review...with time to get a few things done.
' style=

EAA Tech Advisor - Sam Sisk EAA 563

EAA Tech Advisor - Sam Sisk EAA 563

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.