KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  7-10-2013
Number of Hours:  4.00
Manual Reference:  Off Book
Brief Description:  Conduit run - lightening hole preparation

The conduit passes through a lighting hole in the aft fuselage bulkhead. This area will not be accessible for inspection. I installed a 3/4" x 3/4"angle with two 3/4" WDG12 cushion clamps. The angle will be riveted onto the bulkhead before the bottom skin is installed. No spring clip caterpillar is needed here because there is 1/8" of distance between the clamp rubber and the bulkhead opening. The clamps will be fastened with AN3-3A bolts and AN365-1032 nuts.
' style=

Right side conduit rough in

Right side conduit rough in

' style=

Cushion clamps added - forward view

Cushion clamps added - forward view

' style=

Aft view

Aft view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.