Cleaned up the shop from prosealing the left tank and started the right tank. Cut, deburred the tank stiffeners, fluted the ribs and cut the J channel to size. The fuel tank skin was stripped of its plastic from the inside and deburred. I got the outboard rib and inboard nose rib install. I also had time to install the three most inboard ribs.