KitLog pro

Powered By Kitlog Pro v2.0

TERRY'S WEB SITE
' style=
Date:  2-22-2013
Number of Hours:  4.00
Manual Reference:  Section 18
Brief Description:  Prosealed left fuel tank stiffeners and back rivet

Installed the left fuel tank stiffeners today... there were 14. I needed to keep the rib mating surface clean so I covered it with tape before installing the stiffeners. Each stiffiner was 'buttered' with proseal and then placed on a line of rivets taped through the skin. After pressing in place, the rivets were back riveted. After each stifferer was riveted, I covered each rivet back with some proseal. Vans notified me that the change I want to make in the vent line was acceptable. Though it will still be connected by a bracket, I moved the bracket to the aft side of the fuel fill opening rather then the forward side. It requires a bend, but will be higher in the tank.
' style=

Taped off rib mating surfaces

Taped off rib mating surfaces

' style=

Back riveted the stiffeners

Back riveted the stiffeners

' style=

Covered each rivet back with proseal

Covered each rivet back with proseal

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.