KitLog pro

Powered By Kitlog Pro v2.0

RR3 Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  12-7-2019
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Horizontal stabilizer

Wow. This thing is in bad shape. The rust coming through the powder caoting is bad. Sanding was just too labor intensive. I decided to just strip it down instead. I used some industrial stripper and was able to get about 75 % complete today. Still a lot to do but, it is coming along. I have three coats of primer on what work has been done but, I still need to strip the rest and get the priming complete.

We still have the elevator to strip and prime as well as the struts. Time is ticking by but it has to be done right.
' style=

Deep rust from bad factory pre is evident in this picture and number 2 as well.

Deep rust from bad factory pre is evident in this picture and number 2 as well.

' style=

What happened here? trying to get the the comapny party?

What happened here? trying to get the the comapny party?

' style=

75% stripped and primed.

75% stripped and primed.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.