Installed the flap hinge brackets today as well as the backing plate for the bearing we came up with. Tomorrow we will install the flap and the flap return arm. Time to clean up and prep some for wing completion tomorrow.
Brackets and flap stop installed
Backing plate installed inside and out as well as 1/2 of the bearing.
Flap bearing leading edge to be bonded once covered.