Brief Description: Realignment and hinge bracket install began
Feeling better this afternoon. I was able to verify alignment, drill out the rivet holes on the hinge brackets and get everything reinstalled to mark the hinge bracket locations on each of the mounting ribs. This will keep me from spreading Hysol too far up the rib. Things get very messy with Hysol. Carroll and I should be able to get these epoxied and riveted in a few days.
Drilled and clecoed
Another section
deburred, cleaned, paint touch up complete and back on the wing.