KitLog pro

Powered By Kitlog Pro v2.0

RR3 Web Site
' style=
Date:  1-6-2019
Number of Hours:  0.50
Manual Reference:  
Brief Description:  Flap stop

Too cold today to proceed with fiberglassing the leading edges of the Right Flap & Aileron. So, after church this AM, I finished fabricating the right flap stop. Took all of thirty minutes to finish it. We will still have to align the flap and Drill both the hinge brackets and the stop and rivet them in place on both the left and right wings. So, all that remains is to get the stop drilled out and alodined before they get installed.

In the mean time we are ready to begin the fiberglassing. Everything is ready except the temperature. It is supposed to be much much warmer starting tomorrow. So, it might possibly be tomorrow that we get that done. Once the fiberglassing is complete and all the finish work is done on the control surfaces, we can get this wing varnished and prepped for covering. Only then can we get the wings to the hanger and bring the fuselage back to the garage for completion.
' style=

Last bit of filing to do then polish

Last bit of filing to do then polish

' style=

Completed shaping. will polish before we alodine them, then install.

Completed shaping. will polish before we alodine them, then install.

' style=

Ready for fiberglassing of the leading edges. Then it will be the off to finish work.

Ready for fiberglassing of the leading edges. Then it will be the off to finish work.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.