Today was a quick day with a lot accomplished. Cable mounts, tip rib brace, tank hold down brackets and wing attach brackets all installed. I have tacked the butt rib in place and tomorrow, once the Hysol is cured, I will set the butt rib and begin tank installation.
Once we get to that point, we can brgin fabricating the flap and aileron. This wing is moving along well. My only problem so far is the wing attach brackets were not drilled inline with each other. However, since I made the replacements 30% bigger, our EAA Tech Councelor says this should be no problem. He is an A&P so it felt good knowing we don't have to replace these spars as well.