Date:  3-29-2018
Number of Hours:  0.40
Manual Reference:  
Brief Description:  Inspection Review Of left wing

Took some time to do an inspection of what remains to be done on the Left Wing. As close as we are to being finished, there is still lots to do.

1. We still have to align the Aierlon and Flap. Clamp the hinge brackets inplace, drill rivet holes, epoxy and rivet them in place.

2. Align and install the pulley system in the wing.

3. Install supports for Position light wiring and the Pitot system tubing.

4. Fabricate the Wing Tip and install.

5. Fabricate a pair of Wing position lights and install.

6. Run wiring for lights and Pitot tubing.

7. Design and Install a fuel tank strap.

8. Clean fabric surface areas and apply the second and final coat of varnish on the entire wing.

9. Run control cables and guides.

Sounds like a lot (maybe it is) but, each of these are small tasks that will not take long to complete. We are looking forward to swapping the Right wing out for the Left and finishing both of them very soon. Since the learning curve has been overcome, this project will soon take on a full head of steam. It will be time very soon to have the wings inspected.