Had some spare time today to get "something" done on the project. Carroll is out of town on business so I installed the duoblers in the left wing spar and after the epoxy cured I painted the interior end of the spars. I was also able to get half the aileron and flap hinge brackets painted. Now I will let them cure and get to work on building the ailerons for the left wing.
When Carroll gets back, we will bring the fuselage over and mount the wings and install the last wing rib and fuel tanks. Lots to do Lots!
Doublers installed & interior painted
1st Half of the Flap/Aileron hinge brackets painted