Powered By Kitlog Pro v2.0
RR3 Web Site
Ridge Runner 3
Wings
5-14-2016
< Previous Log Entry
Next Log Entry >
Date:
5-14-2016
Number of Hours:
2.25
Manual Reference:
Brief Description:
Wing Rebuild Continuation
Began reassembly today. Realigned spar for washout, prepped tip rib and rib 2 and completed epoxying work on these two. The toughest part wil be the drag tube alignment and reattachment. That will be next weekend.
Rib placement verification
Rib placement verification
Tip rib and rib 2 complete
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Ridge Runner 3 Home
Category
# Logs
# Hours
All
335
713
Empennage
3
14
Fuselage
63
205
Miscellaneous
28
69
None
1
0
Tools
2
4
Wings
238
421
Copyright © 2001-2024 Matronics. All Rights Reserved.