KitLog pro

Powered By Kitlog Pro v2.0

RR3 Web Site
' style=
Date:  11-19-2019
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Dissassembly

Taking a break from the wing tips to get started on repairing the finish on the fuselage. The powder coating from the factory left quite a lot to be desired. So, we have brought the fuselage back form the hanger and have begun dis-assembly in preparation for rust removal, treatment, priming and painting. Carroll and I will be doing quite a lot of work on the fuselage to get it ready to repaint in epoxy. The powder coating seems to have quite a lot of pinholes (most likely due to out gassing from poor preparation or proper cleaning prior to being powder coated). As you can see from the pictures, we have a lot of surface rust to tackle. So, everything must be removed and work begun to eliminate this from happening again.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.