KitLog pro

Powered By Kitlog Pro v2.0

RR3 Web Site
' style=
Date:  4-7-2019
Number of Hours:  1.75
Manual Reference:  
Brief Description:  Realignment and hinge bracket install began

Feeling better this afternoon. I was able to verify alignment, drill out the rivet holes on the hinge brackets and get everything reinstalled to mark the hinge bracket locations on each of the mounting ribs. This will keep me from spreading Hysol too far up the rib. Things get very messy with Hysol. Carroll and I should be able to get these epoxied and riveted in a few days.
' style=

Drilled and clecoed

Drilled and clecoed

' style=

Another section

Another section

' style=

deburred, cleaned, paint touch up complete and back on the wing.

deburred, cleaned, paint touch up complete and back on the wing.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.