KitLog pro

Powered By Kitlog Pro v2.0

RR3 Web Site
' style=
Date:  4-4-2019
Number of Hours:  2.25
Manual Reference:  
Brief Description:  Misc. work on control surfaces

Best laid plans ... never work out as planned. After returning home from our trip, I came down with a cold or something like it. I spent this morning checking and rechecking control surface alignments, drilling the hinge brackets and working on the flap return. Since I did not want to push things and uncertain if I could not make a mistake, I called it quits. I will wait for a better day.
' style=

Hinge brackets drilled for hinge pivot

Hinge brackets drilled for hinge pivot

' style=

Alignment began

Alignment began

' style=

Flap return ready for epoxy and riveting

Flap return ready for epoxy and riveting

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.