Brief Description: Prepping for install of flap and aileron
Spent some time thsi AM getting everthing set up to install the control surfaces. I want everything ready to go when I return in ten days. So far, everything looks good and we will be able to get straight to work when I get back. We have to mark and drill the hinge brackets and then realign the brackets before we rivet and epoy them in place. We wil then build our cradle and trailer them to the hanger for install on the fuselage. Once we get this accomplished, we will align and install our control cable pulleys. Getting closer!
In place ready to align
looks like an easy job from here but not quite. Gaps must be correct.