Date:  8-8-2018
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Left wing now 90% Complete

Today was a milestone for us. We now have the Left Wing 90% complete and were able to swap the left & right wings out. THe Left wing is now hung up on the ceiling and the Right wing is now on the work table again. TIme to bring the Right Wing to the same condition as the Left. We still have the Control Pulleys to install on the left as well as the flap stop but, The pulleys have to wait for the wings to be attached to the fuselage and the flap stop until we pick up a few dozen 5/8 inch stainless steel rivets.

First step on the Right Wing will be to install the trailing edge and cut the slots for the hinge brackets. we will be installing an AOA sensor and tip rib bracing before we begin the Flap and Aileron assembly. This wing should be a much fast build sinc ewe have worked passed the learning curve on the other. Time will tell. Its way too hot to work today even with the AC unit we have. We will wait until Carroll gets back from picking up his BK Flyer project to get back to work. Time to relax for a few days.
' style=

Flsap stop fabricated, fitted and ready to install. Aslo time to cut out the Right side.

Flsap stop fabricated, fitted and ready to install. Aslo time to cut out the Right side.

' style=

Left wing up and out of the way

Left wing up and out of the way

' style=

Right wing on the table ready to begin work in a few days.

Right wing on the table ready to begin work in a few days.