KitLog pro

Powered By Kitlog Pro v2.0

RR3 Web Site
' style=
Date:  3-31-2018
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Misc. small things on my list.

Installed the Fuel Tank retaining brackets Drilled the # 4 Rib for the Pitot tube pass through and fabricated and installed the Lighting and Pitot tubing routing pads. Trying to get some of the nit picky stuff done.
Waiting on the 1 inch 6061 tubing to get here. That might not be untill the end of next week. We need to get the wing tips fabricated and installed. so I can carve the blank for the position lights bases. We can then form them out of the sheet aluminum I have set aside for this. I also need a finished hardwood blank to form the lenses for the LED lamps. I might not have to make lenses for these units since they are ready to install. I do however, wnat to lessen as much drag as possible. We'll see how they look when I get to them. I also need to calculate the lighting load to size the wiring and get it installed
' style=

Fuel tank hold down brackets installed.

Fuel tank hold down brackets installed.

' style=

Pitot tube hole drilled and ready to install pitot tube.

Pitot tube hole drilled and ready to install pitot tube.

' style=

Wiring and Pitot tube routing bases.

Wiring and Pitot tube routing bases.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.