Date:  11-26-2017
Number of Hours:  2.50
Manual Reference:  
Brief Description:  Finished aileron hinges and set up table for left

Between yesterday ( 11/25 ) and today, we completed the left Aileron, and set up the extended table for the flap build. It is a pain getting the table flat and level in each plane. The plywood tends to warp when not being used in the high humidity we have here in FL. We epoxied and riveted in place all of the control hinges for the aileron. We will wait a few days for the table to normalize and check and recheck that everything is still level. Then we will reinstall the aileron and begin building the flap.
' style=

Waiting for the Hysol to cure before we reinstall the aileron.

Waiting for the Hysol to cure before we reinstall the aileron.

' style=

Flap build table extension. What a pain to level with the humidity being so high.

Flap build table extension. What a pain to level with the humidity being so high.