KitLog pro

Powered By Kitlog Pro v2.0

RR3 Web Site
' style=
Date:  10-7-2017
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Left wing - top surface finishing

99% complete with the top of the left wing. only have the spotting putty to finish off. No pictures today. too tired to get the camera out. It is hot and exceptionally humid today. Time for some liquid refreshment and later this afternoon I will finish the Spotting putty finishing. Tomorrow, the wing gets turned over and inspected for where filling may be required.

The bottom of the wing, if I remember correctly, is not as bad as the top was. The factory supplied ribs were not symetrical. In addition they were warped slightly, cupped on the top and had a messy epoxy job. there was lots of clean up to be done. When I begin finishing on the Right wing I will take photos of before and after. I did not think to do that on the Left one. I guess we were overwhelmed by the sheer amount of work to be done. Now we know what to expect and are better prepaired for the work ahead.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.