KitLog pro

Powered By Kitlog Pro v2.0

Swinnys 4 Place Bush Explorer
' style=
Date:  11-18-2011
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Prep of right side elevator for riveting.

Deburred the skin and framework of the elevator and etch primed the inside of the right elevator skin.
' style=

Skin clekoed to frame before drilling out to 1/8

Skin clekoed to frame before drilling out to 1/8"

' style=

Internal surface of right elevator etch primed.

Internal surface of right elevator etch primed.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.