Before doing the final riveting of the bottom skin, I had to decide on and make up a reinforcing backing plate for one of the com aerials and finish the installation of the elevator trim arrangement. I then started on the bottom rivets.
All rivets have been dipped in Duralac for corrosion proofing and sealing.