Powered By Kitlog Pro v2.0
Swinnys 4 Place Bush Explorer
BushCaddy L164
All
2-11-2012
< Previous Log Entry
Next Log Entry >
Date:
2-11-2012
Number of Hours:
20.00
Manual Reference:
Brief Description:
Planning & fitting wiring cables.
Lots of stop start on different aspects of running the wiring & RG58 cables during the last few days.
Finished the radio rack wiring loom.
Plasma 11 Ignition sys. mounted on inside of the firewall.
Nav - Vor spliter mounted and support frame for wires & instruments.
Radios rack wiring harness completed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
BushCaddy L164 Home
Category
# Logs
# Hours
All
531
3616
A/Filter & Snorkle
4
31
Ailerons
7
44
Avionics
7
50
Brake systems
7
35
Cabin
53
372
Controls
22
154
Cowls
15
106
Doors & Windows
11
81
Elevators
9
37
Engine
13
70
Engine Baffles
12
87
Engine mount
1
4
External lighting &
1
15
Fairings
15
98
Final Assembly
4
47
Final Assembly & Ins
4
47
Firewall fittings
7
51
First Flight & Tests
3
13
Flaps
10
76
Flaps
6
45
Fuel System
24
154
Fuselage
42
314
Getting sidetracked!
20
5
Horizontal Stab.
9
95
Instrument panel
12
120
Interior Lighting
2
15
Internal linings
15
81
Kit delivery
2
10
Miscellaneous
16
107
Paint Shop
23
177
Prop & Spinner
1
8
Rudder
6
35
Seat Belts
3
35
Seating
6
58
Static System
3
18
The A P Inspections.
2
12
Undercarriage
11
65
V-Stab
6
45
Vert-Stab
6
45
Wind Screen
4
19
Wings
86
545
Wiring
21
190
Copyright © 2001-2024 Matronics. All Rights Reserved.