KitLog pro

Powered By Kitlog Pro v2.0

Swinnys 4 Place Bush Explorer
' style=
Date:  9-15-2011
Number of Hours:  10.00
Manual Reference:  
Brief Description:  Final riveting of bottom skin

Before doing the final riveting of the bottom skin, I had to decide on and make up a reinforcing backing plate for one of the com aerials and finish the installation of the elevator trim arrangement.
I then started on the bottom rivets.

All rivets have been dipped in Duralac for corrosion proofing and sealing.
' style=

One of the Coms Aerial reinforcing plate

One of the Coms Aerial reinforcing plate

' style=

Elevator trim arrangement

Elevator trim arrangement

' style=

A lot of the rivets in.

A lot of the rivets in.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.