KitLog pro

Powered By Kitlog Pro v2.0

Larrys Exp PA18 Supercub
' style=
Date:  12-25-2013
Number of Hours:  6.00
Manual Reference:  
Brief Description:  seat base construction

This was over couple days of work on the base and jig. The jig I made held the four legs in place and I cut them with a 4 1/2" grinder just with a board on top of the jig then I would flip it over and do the same for the bottom cuts. I have the angle braces to put on yet.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.