KitLog pro

Powered By Kitlog Pro v2.0

Larrys Exp PA18 Supercub
' style=
Date:  1-19-2014
Number of Hours:  6.00
Manual Reference:  
Brief Description:  pulley brackets/floor board

I worked on the aileron brackets and the fairlead for the flap cable to go through. I worked on the temporary front floor board. I’m going to use it for holding all the attach points to weld in place. I can also use it for the pattern to cut out the final one.

Update don't always believe the North Land PA-18 drawings the floor boards drawings are wrong
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.