Powered By Kitlog Pro v2.0
George Henson's Web Site
RV-10
Wings
1-13-2008
< Previous Log Entry
Next Log Entry >
Date:
1-13-2008
Number of Hours:
8.00
Manual Reference:
18-5
Brief Description:
Fuel tanks
Preformed preliminary leak test on right fuel tank. Set up frame to completely support leading edge of tank and filled with water. Three leaks located. Drained tank to dry out. Continued assembly, riveting, and sealing of ribs on left fuel tank.
Two leaks in T-1003C
One lead in T-1003B
Rib assembly, and sealing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
383
2014
Avionics
1
6
Elevators
33
139
Empennage
28
109
Exterior Finnishing
2
12
Fuselage
114
728
Horizontal Stab
26
90
Inspections
1
8
Instrument Panel
4
30
Rudder
17
50
Tailcone
31
132
Vertical Stab
21
59
Wings
105
651
Copyright © 2001-2024 Matronics. All Rights Reserved.