Powered By Kitlog Pro v2.0
George Henson's Web Site
RV-10
Empennage
5-13-2007
< Previous Log Entry
Next Log Entry >
Date:
5-13-2007
Number of Hours:
8.00
Manual Reference:
12-2, 12-3
Brief Description:
Empennage Fairings
Match drilled, deburred, dimpled, countersank and riveted R-1009 Top Rudder Fairing to rudder. Match drilled, deburred, dimpled ,countersank and riveted both E-912's to elevators. Begain fitting HS-910 Horizontal Stabilizer Tip Fairing in place.
Top Rudder Fairing Attached
E-912 being riveted on
Fitting HS-901
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
383
2014
Avionics
1
6
Elevators
33
139
Empennage
28
109
Exterior Finnishing
2
12
Fuselage
114
728
Horizontal Stab
26
90
Inspections
1
8
Instrument Panel
4
30
Rudder
17
50
Tailcone
31
132
Vertical Stab
21
59
Wings
105
651
Copyright © 2001-2024 Matronics. All Rights Reserved.