Brief Description: Elevator bottom re-finishing. Air vent inlets
Over the last couple of days profile sanded the elevator bottom repairs, then re-wiped with 4 coats of epoxy. Started wet sanding, but have run out of 220g and used 360g which took ages. Left the final until I have 400g on hand.
Started sanding the NACA air vent inlets and surrounds, but can't find the form I made to get the shape right. Spend most of a day cleaning the shed, (my usual method for finding something misplaced, but it doesn't work today).
Port elevator still looks a bit dodgy, so sanded it back a bit and refilled.