Powered By Kitlog Pro v2.0
Home of the Spodplane
Cozy IV
CH21 - Strakes
6-2-2020
< Previous Log Entry
Next Log Entry >
Date:
6-2-2020
Number of Hours:
0.50
Manual Reference:
21-05
Brief Description:
Sight gauges and final internal fuel tank details
Pinned beanie through inlet tube, and floxed second cap onto starboard sight gauge.
Drilled and prepped port sight gauge tube and floxed the inlet tubes.
I've been using leftover resin to squeegee over the inside of the fuel tanks, and have now finished!
Floxed on port fuel drain hardpoint
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy IV Home
Category
# Logs
# Hours
All
1058
2210
Casa del Spodd
4
2
CH04 - Fus Bulkheads
36
64
CH05 - Fus sides
17
53
CH06 - Fus Assembly
36
85
CH07 - Fus Exterior
29
56
CH08 - Fus Innards
19
36
CH09 - MLG
74
179
CH10 - Canard
56
115
CH11 - Elevators
38
58
CH12 - Fit Canard
12
19
CH13 - Nose
122
212
CH14 - Center Spar
53
117
CH15 - Firewall
1
1
CH16 - Controls
40
48
CH17 - Air Brake
6
8
CH18 - Canopy
35
106
CH19 - Wings
166
392
CH20 - Winglets
88
169
CH21 - Strakes
132
349
CH23 - Engine & Cowl
11
18
CH24 - Seats, Armres
64
102
Materials
6
4
Miscellaneous
2
5
Shop Supplies
1
6
TC reports
10
6
Copyright © 2001-2020 Matronics. All Rights Reserved.