KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  4-19-2020
Number of Hours:  5.20
Manual Reference:  21-02/04/10
Brief Description:  Strake leading edgesstrainers

Trial fitted & trimmed leading edge some more. Drilled overlap to hold with cleco.

Reassembled strainer installation frame, and nailed on the mesh for the port strainer, and trimmed to fit.

Floxed on starboard leading edge, clamped with cleco and mounted on a straight edge. Micro'd on a 1.5" wide bit of foam to the leading edge top, to act like a 'fish-tail" like the wing core trailing edge. Might work. Micro'd on a couple of planks with leftover micro. [Timewarp: Don't do this, was much easier to see if it was straight on the port side with just the bare skin boundary, and make it straight with the lumber stacked on top.]

Floxed on Port strainer, secured with hot glue blocks and a brick.

Layed up port leading edge over same form as starboard, 2 x BID and peel ply with EZpoxy

320g EZpox used.
' style=

Leading edge clamped in place, drilling for cleco

Leading edge clamped in place, drilling for cleco

' style=

Leading edge installed, whacking on some planks

Leading edge installed, whacking on some planks

' style=

2nd ply, leading edge

2nd ply, leading edge

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.