Brief Description: Canopy frame edge and drip rail take #2
Trimmed, all OK.
Extended the line of the inside drip rail across the longeron and made a little plastic dam, then floxed up the gaps and layed up 2 x BID over the inside of the new bit of the drip rail, extending over the longeron. Peel plied the overlaps.