KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-4-2020
Number of Hours:  3.00
Manual Reference:  18-03/08
Brief Description:  Install Turtleback bulkhead

Trimmed yesterdays work. All OK.

Installed TB-1 bulkhead with flox, held with rivel mandrels from outside the turtleback. Had to break up the J1/2 spacer to get at it.

Latest evolution of taping method. First, (eventual outermost ply), full width on the peel ply, Roughly wet out the peel ply so it sticks to the plastic, then the BID can be draped over the peel ply and easily arranged to match a line of dots on the peel ply 2" apart. Wet out, then drape the next, same width, but 1" shorter each end. Wet out, Paint target with epoxy, then drape, with a line of dots along the center of the tape, (on the peel ply) along the join. Stick it down at one end, peel off the peel ply, Stick it back on the plastic and repeat, overlapping each ply 1" for each length of tape.

On completion, cut up the peel ply and stick on the joins.

Figgering it would be easier before the Turtleback is installe, floxed up the transition, and did upper Firewall Layup #3, leaving #2 to do after Turtleback installation.
' style=

Trimmy, trimmy

Trimmy, trimmy

' style=

Tapey, tapey

Tapey, tapey

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.