KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-26-2023
Number of Hours:  1.00
Manual Reference:  24-03
Brief Description:  MLG fairing repair & NACA lip

3 x BID over port main landing gear fairing repair, overlapping 1/2" further each ply. Peel plied edges.

2 x BID over NACA lip top surface, overlapping bottom 1", and glass to glass at the rear.

No pictures, didn't set up the camera right.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.