KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  9-5-2020
Number of Hours:  0.30
Manual Reference:  24-03
Brief Description:  Front thigh supports taping

Removed formwork, completed trimming, and taped outboard bulkhead to thigh support, and inbound bulkheads to fuselage bottom and instrument panel. Wet out tapes on peel ply and transferred.

I have pre-cut lots of tapes, with the red indicator thread as a guide. This means the red thread is ALWAYS left behind. From now on I will cut tapes between, or across the threads. I haven't decided which yet.
' style=

Taping bulkheads

Taping bulkheads

' style=

More taping

More taping

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.