KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  12-29-2018
Number of Hours:  1.50
Manual Reference:  20-04
Brief Description:  Winglet installation Layup #2

Filled divots with flox, and in keeping with the structural nature filled foam pores with flox slurry.

Did Layup #2, 6 x BID forward of the Rudder conduit, then 2 x BID overall. Peel ply over the IRBH mounting area. Transferred plies 2 at a time on a bit of peel ply, trimming edges with scissors.
' style=

Spreading flox

Spreading flox

' style=

Nailing down the last plies through the peel ply

Nailing down the last plies through the peel ply

' style=

Ist done, trimming the next

Ist done, trimming the next

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.