|
|
Home of the Spodplane
|
Date: 8-7-2018
|
Number of Hours: 3.60
|
Manual Reference: 19-10
|
Brief Description: Left Aileron installation
|
|
Started to trim Aileron gaps, aiming for 0.2" at zero degress, and 0.08" at +/- 2.4". Made a jig to put on the wing next to the aileron with 1.8 & 2.4" up and down marked.
Fitted Aileron, measured gaps, marked material for removal, removed Aileron, sanded, filed, dremelled, repeat. A lot. Finished bottom and end gaps, still working on the upper.
|
|
Trimmy, trimmy
|
|
Measuring 20 degrees, and comparing to the specified distance
|
|
This went on for some time
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |