KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  6-3-2018
Number of Hours:  2.70
Manual Reference:  19-07
Brief Description:  Left Wing top Spar Cap preparation

Fixed left Wing to table top surface up with hot glue blocks. Removed upper jigs.

Cleaned up and sanded shear web and knocked some lumps off joints.

Attached spar cap dams on leading edge of LFC1.

Masked off foam around spar cap trough with packing tape this time, certainly stuck better than the duct tape did. [Timewarp: and was almost impossible to remove, causing huge foam damage. Stick with the duct tape.]

Marked up Spar Cap plies, and covered with clear packing tape.
' style=

Cleaning up the Cap trough edges

Cleaning up the Cap trough edges

' style=

Sanding, sanding

Sanding, sanding

' style=

Last trip around the park for the dam

Last trip around the park for the dam

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.