Powered By Kitlog Pro v2.0
Home of the Spodplane
Cozy IV
CH19 - Wings
3-2-2018
< Previous Log Entry
Next Log Entry >
Date:
3-2-2018
Number of Hours:
1.70
Manual Reference:
19-05
Brief Description:
Right Wing, Spar Cap prep
Sanded shear web & cleaned up some blobs around the edges.
Fitted the dam to the front edge of RFC1.
Filled gaps around shear web with flox.
Prep sanding shear web
Damming the LE
Patching, patching
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy IV Home
Category
# Logs
# Hours
All
1058
2210
Casa del Spodd
4
2
CH04 - Fus Bulkheads
36
64
CH05 - Fus sides
17
53
CH06 - Fus Assembly
36
85
CH07 - Fus Exterior
29
56
CH08 - Fus Innards
19
36
CH09 - MLG
74
179
CH10 - Canard
56
115
CH11 - Elevators
38
58
CH12 - Fit Canard
12
19
CH13 - Nose
122
212
CH14 - Center Spar
53
117
CH15 - Firewall
1
1
CH16 - Controls
40
48
CH17 - Air Brake
6
8
CH18 - Canopy
35
106
CH19 - Wings
166
392
CH20 - Winglets
88
169
CH21 - Strakes
132
349
CH23 - Engine & Cowl
11
18
CH24 - Seats, Armres
64
102
Materials
6
4
Miscellaneous
2
5
Shop Supplies
1
6
TC reports
10
6
Copyright © 2001-2020 Matronics. All Rights Reserved.