KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-25-2015
Number of Hours:  7.10
Manual Reference:  
Brief Description:  MLG Tab inner layup. LB fus layup

Prepped strut for inner Tab layups, filled pilot hole with wax.

Rejigged clamping boards to fit inside Tabs and re-taped.

Layed up MLG Tab inner tabs, same as the outer.

Layed up LB fuselage cutout and inner surface LB.

[Timewarp 26/01/15: Too much, did a crap job on the fuselage, can barely look at it, will have to sand most of it off. Need some thin plastic and more foam to follow this complex a shape. Was too tired to do it properly. Decide to follow the plans in future and do it step by step instead of two different steps at a time.]
' style=

Adjusting clamping boards to fit on the inside

Adjusting clamping boards to fit on the inside

' style=

Flox applied STBD side, laying up UNI PORT

Flox applied STBD side, laying up UNI PORT

' style=

Applying micro to Fus bottom LB cutout

Applying micro to Fus bottom LB cutout

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.