KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  11-28-2014
Number of Hours:  3.00
Manual Reference:  
Brief Description:  MLG strut preparation

Joined tables side-by-side and levelled with threaded rod and levelling blocks.

Screwed stand-off blocks to bench, added some long 10g screws, roughed them up and 5-min flox'd MLG strut on LE down. Seemed to work easiest to prop it in position, lift the strut at each point and butter some 5-min flox on, and leave a little while before playing with it.

Tried hot glueing the coreflute backups for the fairings, worked OK, but they have to come off as the first torsional layup comes first.
' style=

Mounting the standoff blocks

Mounting the standoff blocks

' style=

Hot glueing the BID backups temporarily

Hot glueing the BID backups temporarily

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.